Stomping Grounds on 34th
Our debut with Angler Construction was one for the books on this incredible neighborhood changing project in Garden Oaks. Designed and built for RE:VIVE development this blend of ground-up meets existing structure had to have a seamless paving plan to blend the old to the new. The existing asphalt paving had failed and the grading and drainage were no longer applicable with the extension of the new concrete pavement. We were able to mill down 3″ of existing asphalt and haul off to be recycled into new material. Drains were repaired and grades amended to facilitate correct rainwater collection. We core drilled hot-dipped galvanized bollards to match the theme of the building and also provided long lasting maintenance-free ADA signage that can take a few bumps from patrons. For assurance we installed over 200 car stops to protect the native landscaping and buildings in the intricate striping plan.
Call us today and schedule a no obligation consultation : 713-331-9399
Arrowhead was always timely and very responsive to our requests. We needed a custom stencil for the project, Arrowhead had no issue in providing and installing the stencils. Arrowhead worked after hours as needed to accommodate the construction schedule. I would recommend Arrowhead on any striping project you may have. — Central Builders, Inc.